FAQs: Building Connections
Should you wish to get in touch about any aspect of the building project or fundraising campaign please email us with your comments or questions.
Cost
How much will the project cost?
The combined cost of Phase One and Phase Two, covering construction and fit-out, professional fees, contingencies and allowances for inflation, is estimated to be £7m. This is roughly split £2m on Phase One and £5m on Phase Two. Phase One is expected to be delivered within budget. Phase Two has not yet started.
What if the costs increase over time?
The estimates allow for inflation to impact those parts of the project that will be delivered in the next few years and contingencies for unexpected cost increases. These sums have been calculated by our quantity surveyors who we will continue to work with throughout the project. Revised estimates will be obtained at the end of the design period and before tendering for the construction work.
Where will the money come from?
We have been raising funds specifically for the project. Phase One was fully funded by donations and we already have some pledges in place for Phase Two. We will not use funds from membership fees to fund this project.
What if you don’t raise the money?
We are confident of raising the money to complete this ambitious and important project in its entirety. However, if we are unable to raise sufficient funds, we have the option to reduce the scope of the project.
Will we continue raising money for the collection and other Library activities?
Yes. From collection care and development, to subsidised membership and programming, we rely on charitable contributions to support our work. The fundraising team is committed to strengthening the Library’s collection and services, whilst managing the capital campaign, and we are grateful to all those who choose to support us across a range of projects.
Why not raise this money for books and Library services instead?
We will be raising money from funders who are specifically interested in funding capital projects. This will not stop us from raising funds to support other areas of the Library's work for which the fundraising team have separate targets.
Will my membership fee increase?
We do not expect membership fees to increase as a result of this project. The Library has to increase fees annually to keep up with inflation and increases in operating costs, however, we predict that the redevelopments will help us to further grow membership and income, which helps to keep fee increases to a minimum.
Overview
Are the images shown final designs?
Phase One is now complete. The images shown in relation to Phase Two give an idea of the spaces and uses of the spaces but no design decisions have been finalised at this point.
Will there be removal of bookstacks, collection or capacity for future collection?
To accommodate the Basement Kitchen in Phase One, we removed some shelving and relocated some of our collection to secure offsite storage. This was done in consultation with members and we were able to accommodate the requests members made to retain specific items on site.
Will the Library's opening hours change? Will the catered space be open late?
We do not anticipate a change in opening hours due to the building project or provision of the new facilities. We envisage the catering in the Members’ Room being available during normal opening hours including Monday and Tuesday evenings when the Library is open late.
When will work start?
Phase One was completed in early June 2026. The start date for the construction of Phase Two is subject to fundraising but is unlikely to start before late 2027.
Why are you not building more bookstacks?
Previous building projects have concentrated on building more bookstacks so we are now at a phase where we need to add facilities that we are missing or are very limited at the Library. Further bookstacks may be considered in future building projects.
Will the Library become too busy?
While we expect the project to increase membership, it will also increase capacity, accessibility and services for our members.
How will the project consider environmental sustainability?
The works will comply with all regulations related to environment, current designs include an air source heat pump for the 6th floor, maximised use of natural lighting and photovoltaic solar panels to supply electricity to the 6th floor.
Whose idea was the project?
The project has been in existence in some form for 20 years. In 2005, the Library was granted planning permission for a reading room, members' room and roof garden on the 5th and 6th floor. This has been informed by member, trustee and staff suggestions and feedback and was revisited in our 2018-2024 strategy. Our strategy to 2030 confirmed our intention to deliver the building project.
Who will oversee and manage the project?
The Trustees of the Library overall, the Trustees’ Buildings and Facilities Committee led by Stephanie Hall and the executive team.
Who are the architects involved with the project?
The architects are Haworth Tompkins, previous Stirling Prize winners and specialists in buildings similar to The London Library. They have worked with us since 2004. The design team supporting the architects have been chosen for their similar experience and relationship with the Library on previous projects.
Will the developments increase accessibility?
Yes, especially the plans on the 6th floor, terrace and lift which will all be more accessible than the current offering. The new lift will have room for a person in a wheelchair plus another person, which the current lift does not and there will be turning space on each floor. The lift will also provide a means of evacuation in the event of a fire or other emergency, which the existing lift does not. The current 6th floor offering is not fully wheelchair accessible but the redeveloped 6th floor and the terrace on the 5th floor will be wheelchair accessible. There will also be the addition of an extra accessible toilet on the 6th floor. The New Room, delivered as part of Phase One, is on the ground floor and includes an accessible toilet.
Have Library members been consulted on the proposed plans?
Members were invited to share their feedback and views during a two-month pre-planning application consultation period via a survey, by writing to us, and at our in-person consultation events. The project booklet was sent to all members in the post, and dedicated web-pages were set up explaining the plans. Please see consultation feedback here. Since then, members have been invited to share their feedback via our building connections email account and at the last two Annual General Meetings and recent Extraordinary General Meeting, when the project was discussed in depth. We are very pleased to hear members’ views and continue to welcome feedback.
Sixth floor and roof garden
Why are you building a catered space and roof garden?
Throughout the Library's history redevelopments to the building have been crucial to improving the use of the Library and the member experience. The idea of improving the Library's space on the 5th and 6th floors has been around for over 20 years, with planning permission granted in 2005. Through member surveys we know that a large percentage of members would like to have an improved space to meet with other members and benefit from a better catering offer. By providing these facilities, for those who would like them, in a distinct area of the building we will also strengthen the quiet and undisturbed nature of the other spaces such as the Reading Room. The improved space would also encourage more members to visit the building, enabling greater browsing of the stacks and engaging with the Library’s extensive collection of around one million volumes.
Do members want these new developments?
Yes. We have many years of suggestions from members that they would like a catered space so that they may stay at the Library to eat and drink, meet with other members and have a more informal space in which to read and write. Members have also expressed that leaving the Library to find a café interrupts their focus. Opinions have been given in our regular member surveys, via our building connections email account and through our consultation feedback survey (the results of which are here).
Will the 6th floor catering be open to the public?
No, the 6th floor will not be open to the public. The Library’s existing rules permit members to sign in guests for a brief, accompanied visit. We do not propose to change these rules.
What will the new facilities on the 6th floor and 5th floor roof be?
On the 6th floor, there will be a new reading room (created from back of house space) with 9 seats, a refurbished and enlarged, catered members’ room with an estimated 43 seats, three purpose-built phone booths (one of which will be fully accessible) and four new toilets (one of which will be fully accessible). On the 5th floor level, there will be a new roof garden with an estimated 34 seats.
Will the Library's opening hours change? Will the catered space be open late?
We do not anticipate a change in opening hours due to the building project or provision of the new facilities. We envisage the catering in the Members’ Room being available during normal opening hours including Monday and Tuesday evenings when the Library is open late.
Will books be allowed in the catered space?
Yes, we encourage our members to take care of our books at home and in all areas of the Library.
Will members still be able to bring in their own food and drink?
Yes. We know that this is important to some members and so they would still be able to eat and drink items brought from home in the new 6th floor facility. However, there will not be facilities to make or store food and drink as the kitchen and counter will be a staff area.
What kind of catering offer will be available?
The catering offering has not yet been decided but it is likely to include hot and cold drinks, light lunch options and cakes/pastries. We will be seeking member feedback before deciding on the exact offer.
Who will provide the catering for the 6th floor?
It is anticipated that the catering will be managed in-house.
Works and disruption
Will the Library close during any part of the building works?
No, the Library intends to stay open to members throughout all building works as we have in the past. There may be some areas that are not accessible at some times but we will endeavour to make all of our collections and facilities available.
When will work start?
Phase One was completed in early June 2026. The start date for the construction of Phase Two is subject to fundraising but is unlikely to start before late 2027.
How will you manage noise and disruption?
The Library has undertaken major building works in the past, using the same architects, while remaining open to members so we are confident that we will be able to keep noise and disruption to a minimum. Contractors chosen to tender will need to demonstrate they have completed projects in similar sensitive environments, and we will work with them to enable quiet periods and aim to schedule the most disruptive work when we are not open to members. We will give members regular updates throughout the works.
How will you keep members informed about noise and disruption?
We will use our website, newsletter and building signage to keep members regularly up to date. We will have a regular newsletter and weekly updates to our website that focus on any disruption. We will also write to members and update in our magazine with any substantial updates on the works.
How long will the building work take?
Phase One was completed in early June 2026. The construction part of Phase Two is unlikely to start before late 2027 and is currently anticipated to take about 18 months.
Will there be a loss of desk space during the works?
We are aiming to provide additional seating elsewhere in the building for any spaces lost while works are ongoing.
Will the members' hot drinks vending machine still be available?
We hope to provide the hot drinks vending machine elsewhere in the building while works are ongoing.
What will be the impact on staff?
We will work closely with staff and managers at the Library to ensure the wellbeing of staff and everyone is kept well informed and able to continue to perform their roles at the Library throughout these developments.
Will areas of the collection be unavailable during the Phase Two works?
We do not anticipate areas of the collection being unavailable, there may be areas for which we have to reroute the access and we will increase our capacity to fetch books for members where needed.
Where did the catalogue hall computers go?
These were moved to the Foyle Lightwell Reading Room when work commenced on Phase One, with one being retained in the Issue Hall.
What collection items were moved offsite to enable Phase One?
The material identified for off-site storage was foreign language periodicals and society publications, and journals that have been discontinued. We also completed the off-siting of journals that are available online. Following consultation with members, all of the Russian periodicals and society publications were retained on site, along with a number of titles in other languages that members specifically identified. All items held in off-site store can be retrieved within 72 hours for members to use. We are grateful to those members who have engaged with us over this work.
How much shelving was removed to enable Phase One?
Just over 800 linear metres of shelving was removed, which is 2.7% of the Library’s total shelving capacity.
New Room
What will the New Room be used for?
The New Room will have a wide variety of uses that focus on our public benefit remit as a charity such as meetings of our Emerging Writers, sixth-form school visits, exhibitions and displays, and workshops with other charity partners. It will be used by members for our member groups, speaker events and panel discussions, and trustee meetings. The room will also be available for private hire to help the Library financially.
Will there be disruption to Library members from users of the New Room?
The New Room location was chosen to minimise disruption to other Library users. The room has its own toilets and facilities for storing bags and coats, and any external users will not have free access to the rest of the Library.
Will 'New Room' be the final name for this space?
No. The New Room is likely to be renamed in due course.
Lift
Why are you building a new lift?
The existing central lift is the only lift that provides step-free access to all floors of the building and unfortunately is old and breaks down occasionally. It is not fully accessible and is not an evacuation lift meaning that in the event of a fire or other emergency, it will shut down and be unavailable for use. Although we did investigate updating and increasing the size of the existing lift it was not practicable. It is also likely that with the improved spaces on the 6th floor there will be more members using the Library and two lifts will become increasingly important to reduce waiting times and avoid a situation where the lift breaking down would render the Library largely inaccessible to those in wheelchairs.
Will the lift be noisy?
The architects are working with an acoustician on the whole project and they are specifically choosing the lift for its quietness.
What impact will the new lift have on The Reading Room?
The lift will be visible from the window at the west end of The Reading Room. There is an option for this to be obscured so that it does not change the atmosphere of The Reading Room, for example by frosting the glass of one or more of the windows. The lift car will be obscured so that members travelling in the lift will not be able to see into the Reading Room. We will be discussing these aspects with our architects as the project progresses.
What will happen to the Foyle Lightwell Reading Room when the lift is in place?
The lift will be accessed from the basement corridor, opposite the existing lift and will share lobbies with the existing lift on each floor of the Central Stacks. The Foyle Lightwell Reading Room will remain in place and the lift shaft will be clad in a way that is in keeping with the rest of the room. It is also intended to keep the bookshelves in that room.
Basement kitchen
Why did you add a kitchen in the basement?
Previously caterers had to use The Study as a field kitchen which is not an ideal food preparation space and risked damage to the historic room and collection in that area. Private hire is a successful source of revenue for the Library helping to sustain its financial future. By providing a proper space in the basement, we can continue to support these events in a more appropriate and sustainable way.
In addition, the basement kitchen replaces a back of house kitchenette that was removed to create The New Room. and provides storage of supplies needed to serve the 6th floor catered Members’ Room in due course.